Accelerating Mega Infrastructure Delivery Across Rail, Road & Bridges

Discover how leading EPC contractors, rail authorities, and highway consultancies utilize Aagento's generative engineering platform to compress 9-month drafting cycles into weeks, optimize cut/fill earthwork, and prevent multi-crore DPR cost discrepancies.

82%
GAD Drafting Time Saved
From 9 months to 3 weeks on mega freight corridors
₹35+ Cr
Cost & Rate Anomalies Flagged
Pre-tender SOR audits & quantity takeoff verification
1,400+
Kilometers & Spans Modeled
Across High-Speed Rail, Expressways & Metro lines
100%
RDSO & IRC Code Compliance
IRS, IRC:SP:84, MoRTH & Vol. 1 Proforma 2023 certified
Featured Flagship Case Study · DFCCIL Corridor

Automating 42 Railway Over Bridges on Western Dedicated Freight Corridor

How a premier Indian EPC consortium replaced 9 months of manual subcontracted drafting with Aagento's Generative GAD engine, securing first-time RDSO clearance and saving ₹4.8 Cr in structural steel and foundation sizing.

21 Days From 9 Months Manual
₹4.8 Cr Material & Found. Savings
100% RDSO/IRS Approval Rate
Read Full Case Study
LIVE CORRIDOR // GAD GENERATION SIMULATION
Dedicated Freight Corridor (DFCCIL)
82% Turnaround Acceleration

Automating General Arrangement Drawings (GAD) for 42 Rail Over Bridges (ROBs)

Scope: 14 Major Bridges & 28 Minor ROBs (25-Tonne Axle Load) Duration: 3 Weeks (vs. 9 Months Projected) Client: Tier-1 Railway EPC Consortium
Traditional Subcontracted CAD: 9 Months Drafting · 7 Re-submission Cycles · ₹4.8 Cr Excess Tonnage
Aagento Generative Platform: 21 Days Automated GAD · 1st Submission Approval · Parametric Optimization
The Challenge

The EPC contractor needed fast-tracked Indian Railways / RDSO GAD approvals for 42 bridges along a critical 120 km freight corridor. Manual drafting across multiple consulting firms resulted in backlogged submissions, inconsistent pier cap geometries, and repeated drawing rejection cycles.

Aagento AI Solution

Deployed Aagento AI Bridge Design (GAD) module. The engineering team configured bridge spans, skew angles, soil profiles, and 25T axle load parameters. The system automatically synthesized full multi-view GAD sheets (Elevation, Plan, Pier Cross-Sections, and Well Foundations) in native DWG format.

Key Measured Outcomes
  • 9-month drafting timeline compressed to 21 days, unlocking immediate site mobilization.
  • 100% RDSO/IRS compliance on first formal submission with zero drafting revision cycles.
  • ₹4.8 Cr estimated material savings via algorithmic foundation sizing and pier cap optimization.
National Rail Infrastructure & Corridor Planning
₹112 Cr Capex & Earthwork Optimization

AI Geometric Alignment & 3D Mass-Haul Cut-Fill Optimization for a 110 km Semi-High-Speed Rail Corridor

Scope: 110 km Double-Line BG Corridor (160–200 km/h Design Speed) in Rugged Terrain Duration: 4 Days (vs. 14 Weeks Manual Alignment Iterations) Client: State Rail Infrastructure Joint Venture
Traditional Alignment Studies: 14 Weeks Manual Route Trials · 8.4 km Tunneling · ₹240 Cr Unbalanced Earth Haulage
Aagento AI Alignment Suite: 4 Days Synthesized Route · 2.1 km Tunnel Eliminated · 42% Cut/Fill Haulage Cut
The Challenge

Traversing complex undulating ridgelines and ecologically sensitive reserved forests, the rail JV had to achieve a strict 1 in 100 ruling gradient with curvature compensation under IRS Broad Gauge standards. Manual route iterations failed to balance cut and fill across major river approaches, resulting in 8.4 km of proposed tunnels and millions of cubic meters in off-site borrow hauling.

Aagento AI Solution

Imported high-density LiDAR DEM surface models into Aagento AI Alignment Design. The generative multi-corridor solver evaluated 24 alternative horizontal and vertical alignments simultaneously, enforcing bridge-governed formation levels over 16 river crossings, statutory right-of-way offsets, and automated Mass-Haul diagram balancing within 500m lead intervals.

Key Measured Outcomes
  • ₹112 Crore overall capex reduction achieved by contour-following curvature optimization.
  • 2.1 km tunnel length avoided completely, bypassing hazardous geology and cutting 18 months off construction schedules.
  • 42% reduction in net earthwork haulage via automated cut-to-fill mass haul balancing across the entire corridor.
  • 14-week DPR alignment phase closed in 4 days with instant export of L-Sections, Cross-Sections, and RoW geo-coordinates.
NHAI Greenfield Expressway Package
38% Cut/Fill Optimization

Corridor Geometric Alignment & DPR Automation for a 62 km 6-Lane Expressway

Scope: 62 km Greenfield Expressway + 4 Major Bridges + 12 Underpasses Timeline: DPR finalized in 14 days (vs. 120 days traditional) Client: Leading Infrastructure Design Consultancy
Traditional Alignment Studies: 120 Days Manual Iteration · 1.2M m³ Earth Haulage Inefficiency · Manual BOQ
Aagento AI Alignment & DPR: 14 Days Delivery · 38% Mass Haul Balanced · 99.4% Contractor-Grade BOQ
The Challenge

Traversing hilly and undulating terrain, the expressway alignment suffered from massive earthwork imbalances, leading to excessive cut and borrow requirements. Frequent alignment iterations caused delays in land acquisition demarcation and environmental clearance submissions.

Aagento AI Solution

Aagento AI Alignment Design ingested LiDAR terrain surfaces and ran multi-criteria vertical profile optimization under IRC:73 & IRC:SP:84 guidelines. The engine automatically balanced mass haul diagrams and synthesized complete DPR Volume 1 & Volume 2 documentation.

Key Measured Outcomes
  • 1.2 Million cubic meters of earthwork haulage eliminated via mass haul profile balancing.
  • DPR delivery compressed from 120 days to 14 days, securing early clearance approvals.
  • 99.4% BOQ & Cost Estimation accuracy verified against actual tender awards.
Urban Metro Rail Transit Authority
10x Modeling Speedup

Transforming 600+ Legacy 2D CAD Drawings into LOD 350 BIM Asset Models

Scope: 18 km Elevated Viaduct, Pier Systems & 12 Station Interfaces Delivery: 4 Weeks (vs. 10 Months Manual BIM Drafting) Deliverable: OpenBridge & IFC Asset Information Model (AIM)
Manual Tekla/Revit Drafting: 10 Months Manual Modeling · Missing Rebar Data · Frequent Erection Clashes
Aagento AI Bridge Digitalisation: 4 Weeks Automated OCR to LOD 350 IFC · Zero On-Site Clashes · Digital Twin Ready
The Challenge

The transit authority mandated an LOD 350 digital twin for corridor O&M and clash detection. However, all existing structural engineering data was locked in over 600 scattered 2D DWGs and scanned PDF blueprints with non-standard layer structures.

Aagento AI Solution

Aagento AI Bridge Digitalisation software ingested the legacy drawing sets, extracted structural dimensions using computer vision and semantic layer parsing, and automatically extruded LOD 350 3D solid geometries with complete rebar detailing and IFC properties.

Key Measured Outcomes
  • 10x faster BIM delivery compared to traditional manual Tekla/Revit authoring.
  • Zero site clash errors during pre-cast pier cap erection due to automated clearance validation.
  • Native IFC 4.3 export fully indexed for the client's asset management digital twin.
High-Speed Rail Corporation
18% Steel Weight Reduction

Generative Span Optimization & Deep Well Foundation Feasibility for a 1.4 km River Crossing

Scope: 1.4 km Major Perennial River Bridge (High-Speed Rail Corridor) Engineering Phase: Detailed Feasibility & Preliminary Structural Design Superstructure: Continuous Steel-Concrete Composite (SCC) Girders
Traditional Trial-and-Error: 2 Months to Test 3 Span Schemes · High Safety Margins Adding ₹8+ Cr
Aagento Generative Structural Engine: 140+ Configurations Overnight · 18% Steel Reduced · Lacey Scour Automated
The Challenge

Severe hydrological scour depth (up to 32 meters) and high seismic zoning demanded rigorous structural and foundation trade-off analysis. Traditional consulting methods could only evaluate 3 span combinations manually over 2 months, risking suboptimal material tonnage.

Aagento AI Solution

Aagento's Generative Structural Engine evaluated 140+ span-depth arrangements overnight. It computed Lacey scour depth under IRC:78, checked hydrodynamic drag, and balanced pier foundation steel/concrete volumes against continuous steel girder span lengths.

Key Measured Outcomes
  • 18% structural steel reduction achieved via balanced continuous span depth profiles.
  • Automated Lacey scour depth analysis eliminating manual hydraulic spreadsheets.
  • Feasibility sign-off accelerated by 6 weeks, securing board budget authorization.
State Road Development Corporation
₹18.4 Cr Discrepancies Caught

Pre-Tender DPR Validation, Schedule of Rates (SOR) Audit & FIRR Verification

Scope: 380 km State Highway Rehabilitation & Widening DPR Package Audit Speed: 48 Hours Automated Verification (vs. 4 Weeks Manual Scrutiny) Standard: MoRTH Vol. 1 Proforma 2023 & State PWD SOR
Manual Consultant IE Review: 4 Weeks Manual Audit · Overlooked SOR Inconsistencies · Post-Tender Claim Risks
Aagento AI DPR Validation: 48 Hours Audit · ₹18.4 Cr Arithmetic & Rate Mismatches Detected · 100% Proforma 2023
The Challenge

Before publishing global EPC tenders, the highway authority needed an urgent audit of the consultant-submitted DPR. The 1,200-page dossier had suspected mismatches between drawing quantity takeoffs, outdated SOR line items, and unindexed financial IRR calculations.

Aagento AI Solution

Aagento AI DPR Validation software processed all 1,200 pages. The audit engine cross-referenced BOQ quantities against typical cross-sections, verified rate analysis against current State PWD SOR tables, and ran economic sensitivity tests for the FIRR and EIRR models.

Key Measured Outcomes
  • ₹18.4 Cr in arithmetic and rate escalation errors identified before tender issuance.
  • Audit completed in 48 hours, preventing costly contractual disputes during execution.
  • 100% Vol. 1 Proforma 2023 compliance verified for Central Government grant clearance.
Performance Benchmark

Traditional Consulting vs. Aagento AI Platform

Comprehensive architectural comparison across engineering delivery workflows.

Engineering Phase Traditional Manual Method Aagento Generative AI Platform
GAD Drafting & Detailing 6 to 9 months using 2D CAD with manual cross-referencing between elevation, plan & foundation sheets. 2 to 3 weeks via parametric generative modeling. Auto-dimensioned native DWGs generated in minutes.
Corridor Alignment & Cut/Fill Static civil software requiring weeks per realignment iteration; prone to heavy cut/fill surplus haulage. Real-time mass haul balancing optimizing terrain grades dynamically under IRC:73 & IRC:SP:84.
BIM LOD 350 Asset Modeling Manual modeling in Revit/Tekla taking 8-12 months with frequent spatial and rebar clash errors. Automated OCR extraction from legacy 2D drawings into IFC 4.3 BIM models with zero site clash.
DPR Preparation & Audit Fragmented Word/Excel spreadsheets, manual SOR lookups, and 3-4 week IE review turnaround. 48-hour automated audit under Vol. 1 Proforma 2023, automated FIRR, and OCR quantity verification.
"Aagento transformed how our structural team handles railway bridge submissions. What previously consumed entire teams of CAD draftspersons for 6 to 9 months is now generated, verified against RDSO standards, and formatted for approval in days. It is an indispensable competitive advantage for mega corridor bids."
EP
Executive Vice President (Civil & Bridges)
Leading National Railway & Highway Infrastructure EPC Contractor
Accelerate Your Infrastructure Pipeline

Ready to Achieve Similar Results on Your Next Corridor?

Whether you are preparing a multi-kilometer highway DPR, rushing bridge GAD approvals for freight corridors, or digitizing legacy infrastructure into BIM, our engineering team is ready to walk you through our platform.

Talk to Engineering Team