Project Mandate & Design Requirements
This 62 km Greenfield Expressway package forms a vital spine connecting national growth clusters. Featuring a 6-lane divided carriageway designed for 120 km/h operations under IRC:SP:84 and MoRTH specifications, the project includes 4 major multi-span river bridges, 12 grade-separated interchanges, and over 40 minor vehicular underpasses (VUPs).
The Conventional DPR Bottleneck
Traditional highway design workflows consumed 4 months of repetitive manual profile drafting. Disconnected vertical profile changes led to severe earth haulage surpluses—requiring 1.2 million cubic meters of borrow material from external quarries. Furthermore, manual Bill of Quantities (BOQ) tallying created high post-tender dispute risks and delayed Central Government project sanction.
120 Days Manual Iteration · 1.2M m³ Earth Haulage Inefficiency · Fragmented Excel Spreadsheets · High Claim Risk
14 Days Delivery · 38% Mass Haul Balanced · 99.4% Contractor-Grade BOQ · Proforma 2023 Volumes 1, 2 & 3
Aagento Generative AI Solution Pipeline
The project replaced fragmented human drafting with Aagento’s four-stage deterministic engineering pipeline:
High-density drone LiDAR point clouds were converted into continuous 3D triangulated irregular networks (TIN).
Automated vertical curve computation adhering strictly to design speed sight distances, camber, and superelevation.
Continuous real-time calculation of cut-to-fill distribution, minimizing external lead distances and borrow pit dependency.
Generated Volume 1 Main Report, Volume 2 Rate Analysis & BOQ schedules, and Volume 3 Engineering Drawings.
Mass-Haul Balancing & Environmental Preservation
Aagento’s vertical profile optimizer dynamically adjusted embankment heights across undulating agricultural zones, ensuring that excavated earth from cutting reaches was immediately recycled as fill for adjoining bridge approaches. This automated balancing eliminated 1.2 million m³ of borrow hauling, preserving surrounding fertile topsoil.
Audited Accuracy & Tender Readiness
The complete Detailed Project Report—spanning 850 pages across 3 volumes—was generated and validated in just 14 days. When the EPC package was tendered, the BOQ rate analysis matched actual contractor bids within a 0.6% margin of error, establishing a new national benchmark for DPR accuracy.
"Generating an entire 62 km expressway DPR with full IRC:SP:84 compliance in two weeks gave our consultancy a massive edge in highway bidding and EPC advisory."